A1 Archway Gyratory, N19

Next

Similar to the works carried out at Elephant & Castle, the Archway Gyratory transformation is currently in progress. The aim is to create a peninsular to improve traffic flow, cyclist safety, and large pedestrianised area. Works started in March and will continue through to 2017.

Follow this link for the case study on the GreenBlue Urban RootSpace that we installed.

http://www.greenblue.com/gb/case-study/islington-archway-gyratory/  

Also see at the bottom of this page the time lapse video of the installation.

Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom
Archway Gyratory
Archway Gyratory
press to zoom

Archway Gyratory RootSpace Installation