A1 Archway Gyratory, N19

Next

Similar to the works carried out at Elephant & Castle, the Archway Gyratory transformation is currently in progress. The aim is to create a peninsular to improve traffic flow, cyclist safety, and large pedestrianised area. Works started in March and will continue through to 2017.

Follow this link for the case study on the GreenBlue Urban RootSpace that we installed.

http://www.greenblue.com/gb/case-study/islington-archway-gyratory/  

Also see at the bottom of this page the time lapse video of the installation.

Archway Gyratory RootSpace Installation

11a Worsley Bridge Road

Lower Sydenham

London

SE26 5BE

T 0208 697 9910

F 0208 695 1919

info@gaviganpaving.co.uk

  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Social Icon

© 2023 by Gavigan Paving Ltd.