top of page
Gavigan Paving Ltd

A1 Archway Gyratory, N19

This project introduced a new public space, a two-way traffic system, dedicated cycle lanes and new pedestrian crossings in the area.

The work was part of the plan to improve London's roads.

As part of the improvements, we completed:

  • Changed the one-way gyratory traffic system to two-way operation

  • Created a new public space

  • Closed the southwest arm of the gyratory outside the Tube station to traffic

  • Permanently reversed the one-way operation of Vorley Road and MacDonald Road

  • Relocated bus stops around the new road layout

  • Built a new two-way cycle route in the public space near Archway Tube station

  • Introduced segregated cycle lanes

  • Installed a new street-level pedestrian crossing on Archway Road (near Despard Road) to replace the pedestrian underpass

bottom of page