Gavigan Paving Ltd

Cycle Way 9

Between November 2021 and July 2022, we delivered a programme of construction works for the C9 scheme.

These changes, which were made between Goldhawk Road and Chiswick Lane have included:

  • Reinstatement of the left-turn filter lane at the junction of Chiswick Lane and Chiswick High Road.

  • Installation of shelters at bus stops between Chiswick Lane and Heathfield Terrace

  • Introduce lay by pick-up and drop-off points for taxis and other vehicles between Chiswick Lane and Heathfield Terrace

  • Replacement temporary traffic wands with permanent, paved barriers, to make road segregation clearer

  • Changes to side road layouts to make cyclists more visible to vehicles

  • Installation of more signs to make the cycle lanes more visible

  • Additional tactile paving and new paving including pavement levelling

  • Introduction raised tables at side roads